Roadwork-SUPPLY & INSTALL 1 STEEL PIPE CULVERT by BORING METHOD on HWY 5, TOTAL LENGTH 45 m CS: 5-06
Supply and install a steel pipe culvert on HWY 5 for Highways.
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.