More Than a Tour: Building a Stronger Western Canadian Economy· Manitoba Chambers of CommerceBank of Canada survey tags Trump's trade tensions as top risk to economy· Financial PostTrump defends his tariffs during Michigan visit even as businesses say they’ve hurt the state· BNN BloombergSix takeaways for Canada from latest U.S. tariff threats; GDP likely rose again in May· rbc.comAre Americans really doing better than Canadians?· Toronto StarUS-Canada bridge opens in Detroit even as trade disputes test the neighbors' ties· The Washington PostThe state of Canada’s economy halfway through 2026· Business Council of CanadaOpinion: Canada’s economy is splintered by a tyranny of small provincial differences· The Globe and MailBillions in trade, 850,000 hours saved and a $6.4B price tag: Gordie Howe bridge by the numbers· CBCLook West: Jobs and Prosperity for a Stronger BC and Canada - Province of British Columbia· gov.bc.caBoC set to hold as inflation and growth concerns fade· rbc.comSmall business investment set to weaken even as economy rebounds: report· hcamag.comCanada Is Losing Ground as Economic Conditions Erode Business Confidence· Canadian Chamber of CommerceTrump is set to defend his economic policies in Michigan, where new Canadian tariffs may sting· The Washington PostCanadian bans on U.S. alcohol ‘clearly’ working and ‘frustrating’ for Trump, former adviser says· BNN Bloomberg
← All tenders
City of Calgary

City of Calgary - Request for Proposal - 26-1648 Track Package

Request for Proposal (RFP)
Estimated value
Not disclosed
Deadline
October 29, 2026
Published
July 27, 2026
Type
Request for Proposal (RFP)
Explore similarAlberta

Full description

Overview of the Project
The Track Package includes Scope A which is the Main Line Track from Ramsay Inglewood Station in the north to the end of the project limits, as well as Scope B the Maintenance Storage Facility (MSF) track. Scope C includes both scopes.
For scope delineation, this RFP is divided as follows:

  • Scope A: Main Line Track
  • Scope B: Maintenance & Storage Facility (“MSF”) Track
  • Scope C: Combined Track Package (Scopes A and B) in its entirety.

Scope A Main Line Track
Ballasted Track: from the Top of Rail (TOR) to the top of the sub-ballast.

  • Test track works
  • Special trackwork (e.g., turnouts, crossovers)
  • Track-related ROW equipment, crossings, and appurtenances
  • Ducting, cable containment, and associated infrastructure
  • Boundary limit south of the MSF turnaround (see Scope B figure below)
  • Design and implementation of all Temporary Works.
  • Field review, monitoring, and reporting for Temporary Works.
  • Support of excavation.
  • Laydown areas and traffic management.
  • Construction noise and vibration mitigation.
  • Environmental mitigation protection measures.
  • Provide all:

o Labour, supervision, and management
o Materials, plant and equipment
o Survey, quality control, and environmental control
o Documentation and testing support
o Interface coordination
Scope B MSF Track
MSF trackwork supply and installation including:
o Direct Fixation (DF) Track: from the Top of Rail (TOR) to the bottom of the plinths (second-pour concrete).
o Ballasted Track: from the Top of Rail (TOR) to the top of the sub-ballast.

  • MSF trackwork (yard and shop) supply and installation
  • Test track works
  • Special trackwork (e.g., turnouts, crossovers)
  • Track-related ROW equipment, crossings, and appurtenances
  • Ducting, cable containment, and associated infrastructure
  • Boundary limit north of the MSF turnaround (see Scope B figure above)
  • Design and implementation of all Temporary Works.
  • Field review, monitoring, and reporting for Temporary Works.
  • Support of excavation.
  • Laydown areas and traffic management.
  • Construction noise and vibration mitigation.
  • Environmental mitigation protection measures.
  • Provide all:

o Labour, supervision, and management
Materials, plant and equipment
o Survey, quality control, and environmental control
o Documentation and testing support
o Interface coordination
Scope C Combined Track Package (Scopes A and B)

  • Main Line trackwork supply and installation including:

o Direct Fixation (DF) Track: from the Top of Rail (TOR) to the bottom of the plinths (second-pour concrete).
o Ballasted Track: from the Top of Rail (TOR) to the top of the sub-ballast.

  • MSF trackwork supply and installation including:

o Direct Fixation (DF) Track: from the Top of Rail (TOR) to the bottom of the plinths (second-pour concrete).
o Ballasted Track: from the Top of Rail (TOR) to the top of the sub-ballast.

  • MSF trackwork (yard and shop) supply and installation
  • Test track works
  • Special trackwork (e.g., turnouts, crossovers)
  • Track-related ROW equipment, crossings, and appurtenances
  • Ducting, cable containment, and associated infrastructure
  • Design and implementation of all Temporary Works.
  • Field review, monitoring, and reporting for Temporary Works.
  • Support of excavation.
  • Laydown areas and traffic management.
  • Construction noise and vibration mitigation.
  • Environmental mitigation protection measures.
  • Provide all:

o Labour, supervision, and management
o Materials, plant and equipment
o Survey, quality control, and environmental control
o Documentation and testing support
o Interface coordination
The following provisions and items are applicable to all respective trackwork scopes, comprising but not limited to the following:
General Provisions

  • Deliver a complete, coordinated, safe, maintainable, and commissionable LRT track system for the respective trackwork scope.
  • The scope split matrix provided in Schedule 9 Construction Contract Form, with the Proponent taking primary responsibility for trackwork.
  • Applies across design, procurement, construction, testing, commissioning, handover, and warranty.

Track equipment, including the supply, fabrication, delivery, installation, adjustment, inspection, and acceptance of:

  • Running rail
  • Jordan rail
  • Ties
  • Ballast
  • Direct fixation assemblies
  • Embedded track components
  • All required fittings and fixations
  • Guard rails
  • Restraining rails
  • Insulated joints
  • Expansion joints
  • Rail anchors
  • Rail lubricators
  • End-of-track protection devices
  • Special trackwork
  • Switch clearance devices
  • Switch heater equipment
  • Level crossings
  • Track drainage interfaces
  • Cable containment
  • Track troughs
  • Concrete plinths (second pour)

System assurance for the scope of trackwork, including all applicable inspection, testing, and commissioning activities required for the respective trackwork scopes, including:

  • Factory Acceptance Testing (FAT)
  • Factory Integration Testing (FIT)
  • Pre-Installation Check-Out (PICO)
  • Site Acceptance Testing (SAT)

Integrated interface testing

  • Trial running support
  • Closeout evidence
  • Acceptance testing
  • Any other activities applicable to the specific scope of work.

Interfaces with other Construction packages

  • Stations, bridges, MSF building
  • Public roads and pedestrian crossings
  • Utility zones and embedded track areas
  • Transition slabs and systems equipment locations
  • Temporary tie-ins for staged construction
  • Communications & Traction Power Systems (wayside)
  • Signaling & Train Control Systems
AI Summary

Calgary track package RFP for Main Line and MSF tracks, suitable for Canadian rail contractors.

AI Analysis

Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.

Basic information

Reference
26-1648
Buyer
City of Calgary
Method
RFP
Estimated value
Not disclosed
Source
alberta

Delivery & regions

Province
Alberta

Key dates

Published
July 27, 2026
Closes
October 29, 2026

Live tenders

Department of Transport (TC)1 day left

Sunken Vessel Assessment

Services
81 MATCHView →
Department of National Defence (DND)1 day left

Guildline 5032 Variable Temp Air Bath

Goods
81 MATCHView →
Department of National Defence (DND)1 day left

Automated Turntable System

Goods
78 MATCHView →