Cape John, Nova Scotia - Breakwater Betterment
SCOPE OF WORK
Fisheries and Oceans Canada (DFO), Small Craft Harbours (SCH), requires the services of a qualified contractor to undertake breakwater improvement works at Cape John Harbour, Pictou County, Nova Scotia. The project involves the supply of all labour, equipment, materials, supervision, transportation, and incidentals necessary to complete the work in accordance with the plans and specifications.
The work generally includes, but is not limited to:
- Mobilization and demobilization of personnel, equipment, and materials to and from the site;
- Sitework, demolition, and removal activities associated with the existing breakwater;
- Removal, sorting, stockpiling, salvage, and reinstallation of existing armourstone and filter stone suitable for reuse;
- Supply, hauling, placement, and grading of new armourstone (4–5 tonne class) to the lines and grades indicated in the contract documents;
- Construction activities required to restore and improve the existing breakwater structure;
- Implementation of all required environmental protection, erosion and sediment control, navigational safety, and health and safety measures;
- Final site restoration, cleanup, and disposal of surplus materials
The work will occur within an active fishing harbour and must be coordinated to minimize disruption to harbour operations.
FAMILIARIZATION WITH SITE
Before submitting a bid, it is recommended that Bidders visit the site and its surroundings, at their own expense and schedule, to review and verify the form, nature and extent of the work, materials necessary for the completion of the works, the means of access to the site (including ferry services), severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account of error or negligence to properly observe and determine the conditions that will apply.
Take all appropriate safety measures for any site visit, either before or after acceptance of the bid.
CONTRACT PERIOD
The period of the contract is from contract award until January 29, 2027.