The purpose of this work is to assess the condition of approximately 600 m sections of three (3) concrete wastewater trunk mains (total 1800m) located between Barlow Trail and the Ogden Siphon Control Chamber.
See Ariba for detailed scope.
The purpose of this work is to assess the condition of approximately 600 m sections of three (3) concrete wastewater trunk mains (total 1800m) located between Barlow Trail and the...
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.