The purpose of this work is to assess the condition of approximately 600 m sections of three (3) concrete wastewater trunk mains (total 1800m) located between Barlow Trail and the Ogden Siphon Control Chamber.
See Ariba for detailed scope.
The purpose of this work is to assess the condition of approximately 600 m sections of three (3) concrete wastewater trunk mains (total 1800m) located between Barlow Trail and the...
Obtenez un résumé en langage clair de cet appel d'offres — ce qu'ils demandent, qui peut soumissionner, comment l'aborder et des conseils pour les petits fournisseurs. Quelques secondes suffisent.