Critical Safety repair Bearspaw South Feedermain at 8 – 11 locations (there could be more locations depends on the investigation and designing).
Pre work (locates, design, survey, traffic detours, order materials)
Assign Contractors (construction work plan, safety work plan, pumping permits, inspections, contracts)
Materials & Location – laydown areas: Original laydown for Site D & SW of intersection of 83rd ST and 33rd AV NW.
Site E
Reference# 10039
Chainage from Inspection Point: -152+24 (feet)
Repair method: Rebar & concrete encasement.
Site F
Reference# 10080
Chainage from Inspection Point: 166+91
Repair method: Rebar & concrete encasement.
Site G1 & G2
Reference# 10118 & 10122
Chainage from Inspection Point: 169+06 (feet)
Repair method: Rebar & concrete encasement.
Site H1 & H2
Reference# 10236 &1038
Chainage from Inspection Point: 171+78; 171+94 (feet)
Repair method: Rebar & concrete encasement.
Site I
Reference# TBC
Chainage from Inspection Point: 171+78; 171+94 (feet)
Repair method: Rebar & concrete encasement.
Site J
Reference# TBC
Chainage from Inspection Point: 171+78; 171+94 (feet)
Repair method: Rebar & concrete encasement.
Potential three additional break sites (40-45 wire breaks).