Flagging services are required for the Douglas Fir Trail #3 slope stabilization project, as the work will occur within CPKCR’s right-of-way (ROW).
Flagging services are required for the Douglas Fir Trail #3 slope stabilization project, as the work will occur within CPKCR’s right-of-way (ROW).
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.