Storm Clouds Continue to Gather Over Canada’s Economy· EnergyNowOpinion: Mark Carney’s climate ambitions still threaten Canada’s economy· Financial PostQ3-26 Canadian Business Outlook Survey: More firms plan cost pass-through· RBCA new chapter in Canada-India economic relations· Business Council of CanadaStaying in Canada is a 'huge relief' for Alberta business leaders· CBCTrump administration cancels some Canada tariffs amid close midterm races· NBC NewsWhat Canadian Businesses Must Embrace to Compete in a Volatile Global Economy· Open CanadaCarney, Erdogan launch ‘strong and resilient’ Canada-Turkiye partnership· Al JazeeraGlobal trade is changing how the Canadian economy works· Bank of CanadaEastern Canada business leaders call for ‘single economy’ between Atlantic provinces· Global NewsCanada’s services PMI shows sector shrinking for fourth straight month in September· The Globe and MailSoft economy should limit Bank of Canada's rate hikes: Capital Economics· BNN BloombergCanada’s $1 Trillion Defence Buildout Could Strengthen Canadian Industry· Canadian Chamber of CommerceCanada’s inflation data, business survey on tap ahead of BoC decision· RBCPosthaste: U.S. businesses feel fresh pain from trade war with Canada, says this hot take on the economy· Financial Post
← All tenders
City of Calgary

City of Calgary - Request for Proposal - RFP 26-1580 Ramsay Elevated Guideway

Request for Proposal (RFP)
Estimated value
Not disclosed
Deadline
October 20, 2026
Published
July 9, 2026
Type
Request for Proposal (RFP)
Explore similarBuilding and Facility Construction and Maintenance ServicesAlberta

Full description

Overview of the Project
The planned Ramsay Elevated Guideway construction package including
elevated rail structure between the Ramsay/Inglewood Station at
approximately 11th Street (STA: 116+450) to the 26 Avenue Station (STA:
117+275). It includes civil and structural works, including but not limited
to piling, piers, approach slabs and deck for the construction of the
elevated guideway. The scope extends to earthworks, utilities, duct
banks, cable containment, OCS foundations, roadworks and multi-use
pathways, and construction management functions.
Further to the overview the scope of work comprises but not limited to the
following:
Priority Package Interface (Blackfoot Trail LRT Bridge)
a) Interfaces with Priority Package - Blackfoot Trail LRT Bridge in
between (STA IB 116+060 to 116+160).
Site Works
a) Site preparation, stripping, cut/fill, stabilization, and support of
excavation as required to enable the construction of the Works.
b) All final grading, associated landscaping works and site servicing.
c) All temporary access roads, traffic control measures and permanent
roads
d) Temporary servicing, drainage, stormwater management, and
dewatering.
e) Removal/storage/reinstatement of City street furniture.
f) Removal/relocation of any infrastructure in conflict with the Works.
g) Site preparation for transfer to Track Contractor.
Civil Works – Elevated Guideway
a) All elevated guideway works including but not limited to, piling, piers,
abutments, wingwalls, girders, deck, barriers, plinth pockets, safety
railing and deck anchorage for overhead catenary system (OCS).
b) All required elevated guideway drainage infrastructure as required.
c) Drainage infrastructure and tie-ins.
d) All infrastructure including anchors and dowels for plinths if required
to tie in with the track structure.
e) All required electrical isolation, grounding and bonding work.
f) All low voltage electrical lighting fixtures, conduits and tie-in.
g) All fire & life safety pipes, valves & appurtenances, testing &
commissioning.
Project-Wide Works
a) Design and implementation of all Temporary Works.
b) Field review, monitoring, and reporting for Temporary Works.
c) Support of excavation.
d) Laydown areas and traffic management.
e) Construction noise and vibration mitigation.
f) Environmental mitigation protection measures.
Interfaces with other Construction packages
a) Ramsay/Inglewood Station: Two stations, guideway, utilities buildings,
MSE / secant pile wall, MUPs, and roadworks.
b) Communications & Traction Power Systems (wayside).
c) Signaling & Train Control Systems.
d) Trackwork above sub-ballast.

AI Summary

Overview of the Project The planned Ramsay Elevated Guideway construction package including elevated rail structure between the Ramsay/Inglewood Station at approximately 11th Stree...

AI Analysis

Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.

Basic information

Reference
26-1580
Buyer
City of Calgary
Method
RFP
Estimated value
Not disclosed
Source
alberta

Classification & terms

UNSPSC
UNSPSC 72000000 — Building and Facility Construction and Maintenance Services

Delivery & regions

Province
Alberta

Key dates

Published
July 9, 2026
Closes
October 20, 2026

Live tenders

City of Toronto2 days left

The City of Toronto’s Engineering & Construction Services division is bringing forward a Request for Tenders for Rehabilitation of Bridge ID147 Don Mills Road over Metrolinx and Bridge ID801 Tara Avenue over Metrolinx and TTC Busway as furt…

Construction
76 MATCHView →
City of Toronto2 days left

Request for Tenders (RFT) for Watermain Replacement and TTC Track Replacement on King Street West between Portland Street and Spadina Avenue. Please review all documentation pertaining to the tender in the SAP Ariba publication or register…

Construction
79 MATCHView →
Islands Trust (Islands Trust)2 days left

Islands Trust Accessibility Plan Development

Construction
81 MATCHView →