The planned Shepard to Bow construction package spans from Shepard Station(Sta 100+000) to the future Ogden Bridge (Sta 111+700), excludes the Barlow Trail Bridge segment (Sta 101+900 to Sta 102+850). (Proponents are to note, a discontinuity in chainage exists between (Sta 108+100 and Sta 110+000).
The planned Shepard to Bow construction package spans from Shepard Station(Sta 100+000) to the future Ogden Bridge (Sta 111+700), excludes the Barlow Trail Bridge segment (Sta 10...
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.