The Work generally comprises of:
The replacement of one (1) existing 1800mm diameter corrugated steel pipe culvert with one (1) 1950mm diameter concrete pipe, the supply and placement of washed rock pipe bedding, pipe end rip-rap and geosynthetics, and gabion baskets, followed by the restoration of the access road with 20mm (3/4”) granular base course, barbed wire fence, ditches and side slope grading, and erosion control matting placement. The project is located on the SE-25-53-1-W4 at the City of Lloydminster Raw Water Pumphouse site approximately 32 km north of Lloydminster.
The Scope of Work will be completed within an active storm water drainage course with the flow of water to be maintained as reasonably practicable. The transportation and accumulation of silt and sediment in downstream drainage courses/channels shall be maintained to a minimum.
The Work generally comprises of: The replacement of one (1) existing 1800mm diameter corrugated steel pipe culvert with one (1) 1950mm diameter concrete pipe, the supply and place...
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.