Project Description
Wharf Demolition, North Harbour (St. Mary’s Bay), NL
The scope of work for this project consists of the furnishing of all plant, labour, equipment and material to demolish the existing wharf structure in North Harbour (St. Mary’s Bay), NL. Work is to be performed in strict accordance with these specifications and accompanying drawings and subject to all terms and conditions of the Contract.
In general, the work under this contract consists of, but will not necessarily be limited to, the following:
.1 Demolition, removal from site, and disposal of all materials at an approved waste disposal facility of the existing wharf structure as noted on the drawings. The existing structure contains creosote timber as indicated on the plans.
.2 Rehabilitate the site to its natural conditions.
FAMILIARIZATION WITH SITE
Before submitting a bid, bidders can visit the site and its surroundings, at their own expense, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure, and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies, and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply.
Contractors, bidders, or those they invite to site are to review specification Section 01 35 28 – Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid.