WORK SITE LOCATION
Merritt, British-Colombia
DELIVERABLES / SCOPE OF WORK
The purpose of this work is to upgrade and modernize the pump control system in Well C, according to drawings and specifications as supplied by Fisheries and Oceans Canada. The work includes, but is not limited to, the removal of designated existing pump control system components; supplying and installing a new pump control panel, instrumentation and associated components; testing and commissioning the system.
Work under this Contract includes but is not limited to the provision of all labour, materials, and equipment required to:
1 Mobilization of all necessary equipment, material and crew to the site.
.2 Removal of designated equipment, panels and feeders. Any damage to the remaining portion of the pump control system, building, or equipment, due to negligence by the Contractor or his employees shall be repaired and/or replaced at the Contractor’s expense.
.3 Installation of the new pump control panels, instrumentation and associated components as per the supplied drawings and specifications. All construction materials and equipment to be supplied by the Contractor.
.4 Testing and commissioning of the pump control system.
.5 Clean-up of the work area and demobilization of equipment and crew from the site.
EXPECTED START AND COMPLETION DATES
The services of the Contractor will be commencing upon contract award. The expected completion date of this project is July 14, 2017.