The City requires an engineering consultant to assess the existing roof and supporting structure at the Water Treatment Plant, 655 River Street West, and design a lifting extension for the Actiflo area.
The two goals are to:
1. Confirm whether the structure can safely support a 4,000 lb lifting load and identify any strengthening needed. Analyze the different trusses and provide a maximum lifting weight at various points on the trusses.
2. Design an extension arm or beam to lift and remove mixers and other critical equipment to an accessible maintenance area.
The City requires an engineering consultant to assess the existing roof and supporting structure at the Water Treatment Plant, 655 River Street West, and design a lifting extension...
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.