The Lethbridge Research and Development Centre (LeRDC), Building 102 was constructed in 1977. The intent of this project is to upgrade the existing 1977 electrical infrastructure and distribution to address existing deficiencies. A 2021 Feasibility Study states that within the MCCs, wiring from emergency sources and normal power are mixed in the raceways, cables, boxes, and cabinets, and that the MCCs are fed by both normal and emergency power. Providing upgraded power systems for Building 102 at the RDC will reduce risks of equipment burn outs, fires, and arc flash incidents.
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.
Suppliers who have won similar work from this buyer before.
EASTPOINT ENGINEERING LIMITED is the most likely incumbent, based on how often and how recently they have won this buyer’s work in this category. To displace them, expect to need a clearly stronger proposition or price.