PSPC requires replacement of the Dock Tunnel watermain at Esquimalt Graving Dock (EGD) in Victoria, BC. The project includes all labour, materials, and equipment to remove the existing watermain and install a larger one in the north and south service tunnels (confined spaces), including associated connections.
Additional work includes replacing a section of the sanitary main, demolishing and installing new water service connections, upgrading firefighting connections, rerouting a compressed air line, replacing water meters, and installing monitoring instrumentation (e.g., SCADA-linked sensors). New pipe supports and full commissioning are also required.
Work may begin upon contract award and must be fully completed, including cleanup, within 38 weeks.
Lowest Price
PSPC requires replacement of the Dock Tunnel watermain at Esquimalt Graving Dock (EGD) in Victoria, BC. The project includes all labour, materials, and equipment to remove the exis...
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.