Work to be performed along the section of Alaska Highway between km 700 and km 704 (Muncho Lake) in accordance with the project drawings:
Installation of about 12,240 m2 of rock fall attenuation mesh including all necessary anchorsScaling of about 500 m2 between km 700+000 and km 700+450 in areas identified on the project drawingsScaling of rock cut between km 701+000 and km 702+250 where rockfall attenuation mesh is to be installed to ensure worker safetyRemoval and disposal of all material generated during scalingWork to be performed along the section of Alaska Highway between km 255 and km 256 (Sikanni Hill) in accordance with the project drawings:
Scaling of rock face in areas identified on the project drawings or as per the instruction of the departmental representative between km 255 and km 256Scaling of rock cut between km 255 and km 256 where rockfall attenuation mesh is to be installed to ensure worker safetyInstallation of up to about 1,350 m2 of rock fall attenuation mesh as needed due to removal during scaling or damage to existing mesh including all necessary anchors