The project includes installation of pipe culverts, excavation/ditching, and riprap end protection, placement of grout in decommissioned existing corrugated steel plate (CSP) culverts, and hydraulic seeding of disturbed areas. The sites are located from Km 177.002 to 726.265 of the Alaska Highway between Fort St. John, BC and Watson Lake, YT.
The Contractor must reach Substantial Completion of the project by March 15, 2027, and Final Completion of project by March 31, 2027.
Lowest Price
The project includes installation of pipe culverts, excavation/ditching, and riprap end protection, placement of grout in decommissioned existing corrugated steel plate (CSP) culve...
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.
The project includes installation of pipe culverts, excavation/ditching, and riprap end protection, placement of grout in decommissioned existing corrugated steel plate (CSP) culverts, and hydraulic seeding of disturbed areas. The sites are located from Km 177.002 to 726.265 of the Alaska Highway between Fort St. John, BC and Watson Lake, YT.
The Contractor must reach Substantial Completion of the project by March 15, 2027, and Final Completion of project by March 31, 2027.