The scope of work consists of removal of an existing wood floor in the gymnasium and installation of resilient athletic flooring with an approximate area of 357m2 as well as floor socket installations.
The existing gymnasium is not usable by the school, and contractors are able to access it immediately to complete the work.
Replace gym wood floor at Frontier School with 357 m² resilient athletic flooring and install floor sockets; immediate access, suitable for Canadian SMEs in flooring/renovation.
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.