Water/Sewage/Storm Water Analysis, for 5 CDSB Gagetown NB Public Works and Government Services Canada has the following requirement, but not limited to: a. Work covered under this Service Contract includes the provision of all following testing and analysis in a timely manner: .1 Potable water testing and analysis refer to Annex ‘B’; .2 Sewage water testing and analysis refer to Annex ‘B’; .3 Storm water testing and analysis refer to Annex ‘C’. b. Samples will be collected for potable and sewage water testing for the Engineer by the specific facility Supervisor and their personnel. Any additional mixing and addition of chemicals will be the responsibility of the laboratory. c. Contractor will be responsible for the physical collection of storm water samples outlined in Annex ‘C’. Period of Contract from June 1, 2023 to March 31, 2024, with option to renew for 3 one year periods. All work is to be performed in accordance with the plans and specifications for DND Project Number L-G2-9900/1892. The estimated cost for this opportunity is within the following cost category: between $500,001 to $1,000,000 (HST not included).