Work of this Contract comprises of but is not limited to the following:
1. Removal of 4 existing fuel tanks.2. Demolition of existing above and below ground fuel piping. 3. Supply and installation of 3 new above ground double walled fuel tanks. 4. Supply and installation of new above ground fuel oil piping, related devices and accessories. 5. All required testing and commissioning. 6. Supply and installation of a new fuel-dispensing pump. 7. Demolition of existing fuel alarm systems and wiring.
Two site visits will be held, attendance at one of the two is Mandatory.
Option #1 will be held on July 7 2016.Option #2 will be held on July 8 2016.