Installation of a new 250 kW exterior natural gas standby generator housed in a pre-manufactured walk-in enclosure on a new concrete pad at the south side of the Courthouse. Work includes new electrical distribution equipment (main distribution panel, automatic transfer switch, and transformer), new service feeders from the existing ATCO utility transformer, modifications to the natural gas service and meter, and all associated mechanical, electrical, and structural works.
*Clarification 01 Issued August 13, 2026; Issued to Bidders that have signed the required NDA's*
*Addendum 01 Issued August 25, 2026; Issued to Bidders that have signed the required NDA's*
*Clarification 02 Issued August 26, 2026; Issued to Bidders that have signed the required NDA's*
*Addendum 02 Issued August 26, 2026; Issued to Bidders that have signed the required NDA's*
Clarification 03 Issued August 31, 2026; Issued to Bidders that have signed the required NDA's*
*Addendum 03 Issued August 31, 2026; Issued to Bidders that have signed the required NDA's*