Trade Agreement: Canadian Free Trade Agreement (CFTA)
Tendering Procedures: All interested suppliers may submit a bid
Competitive Procurement Strategy: Best Overall Proposal
Comprehensive Land Claim Agreement: No
Nature of Requirements:
Addendum 003
This addendum modifies the tender documents as indicated hereafter:
Answers to questions received (9 TO 13).
*************
Addendum 002
Closing date for the above mentioned project has been postponed until 2020, january 23, 2:00pm
**************************
Addendum 001
This addendum modifies the tender documents as indicated hereafter:
Answers to questions received.
****************************
Underwater inspection, maintenance, repair - PSPC for Fisheries and Ocean Canada
EE517-191905/A
Harvey, K.
Telephone No. - (514) 607-2867
Regional Individual Standing Offer (RISO)
Accord de libre échange canadienne (ALEC)
RISO - Underwater inspection, maintenance and repair
Period: Two (2) years from the date of issue. Possibility of three (3)
additional one-year extensions.
***THIS DOCUMENT CONTAINS AN INDUSTRIAL SECURITY REQUIREMENT***
At offer closing, the Offeror must hold a valid Security Clearance as indicated in section IP09 and SC01 of the Supplementary Conditions. Failure to comply with this requirement will render the offer non-compliant and no further consideration will be given to the offer.
PSPC on behalf of the Department of Fisheries and Oceans Canada, this requirement is for underwater inspection, maintenance and repairs at the Maurice Lamontagne Institute, 850 Route de la Mer, Mont-Joli. See requirement details in the Scope of Work at Appendix 3.
The purpose of these Specifications is to carry out inspections and
underwater maintenance as described in the Scope of Work of these Specifications at the Maurice Lamontagne Institute located at 850 Route de la Mer, Mont-Joli.
The Contractor must reach an agreement with the Departmental
Representative as to the completion date of the inspection and maintenance.
The Contractor must provide all documents, specialized labour, materials
and equipment appropriate for the completion of the work, such as the
following:
- Task Safety Analysis Form
- Work Procedure for Inspection and Maintenance Work
- Lockout Procedure
- Procedure for Working in Confined Spaces
- Diving Emergency Medical Plan
- Diver Cards
- Competency Cards
- Certification for Working in Confined Spaces
- Licences
- Commission des normes, de l’équité, de la santé et de la sécurité du travail du Québec (CNESST) - Construction Site Opening and Closing Notices
- Necessary Equipment for Proper Execution of the Work
SCOPE OF WORK
Note: Here is an example of the work that may be done by the Standing Offer
DESCRIPTION OF WORK
- Seawater intake system and pre-filters
- Visual inspection of the two pre-filters of the seawater intake system to assess the condition of the components.
- Observation of the countercurrent washing operation «Backwash»
- Visually inspect the two seawater intake pipes;
- Inspect all flanges of the two lines of the seawater intake and replace them according to wear. Flanges will be provided by PWGSC
- Inspect of concrete pads.
- Inspect and change all sacrificial anodes (if covered with sand, remove sand to carry out the inspection), depending on the degree of wear;
- During the inspection, also carry out a detailed inspection of the level of silica sand within the pre-filters.
- Take videos and pictures of the general condition and any failures;
- Replace a thermograph with a new thermograph to be provided by the
Fisheries and Oceans Canada ( DFO) client;
- Visually inspect all flanges and other components located in the two wells of the Block E pumping station;
- Recommend appropriate procedures to be followed to inspect and carry
out maintenance on the components of these facilities and structures;
- Following the cleaning and inspection work, draft a report and
recommendations and submit two copies of the report and
recommendations as well as two copies of a video of the operations to the Departmental Representative.
- Upon completion of the Inspection, the Contractor must restore the site to its natural state;
- Comply with all occupational health and safety standards and possess
relevant certificates prior the beginning of the mandate;
- While carrying out the project, it is vitally important to co ordinate project activities with PWGSC officials and employees responsible for building maintenance.
EVALUATION AND BASIS OF SELECTION
EVALUATION PROCEDURE
Offers will be assessed in accordance with the entire requirement of the Request for Standing Offers including the technical and financial evaluation criteria.
Before bidding, the Offeror must ensure that it has the resources available and qualified to meet the entire requirement described in the Statement of Work and to comply with the security requirements.
FINANCIAL EVALUATION
Mandatory financial criterion at close of bids; Offerors must submit firm all-in rates in accordance with and based on the format used in the Basis of Payment in Appendix 4, (also as an attachement) FOB Destination for services, not including Applicable Taxes,
but including all customs duties and all applicable excise taxes.
EVALUATION METHOD
The bid price will be evaluated in Canadian dollars, not including Goods and Services Tax or Harmonized Sales Tax, FOB Destination, including Canadian customs duties and excise taxes. The bid price will be calculated by determining to total evaluation amount. That amount will be calculated by totalling the evaluation amount for this period.
BASIS OF SELECTION
An offer must comply with the requirements of the Request for Standing Offers to be declared responsive. The responsive offer with the lowest evaluated price will be recommended for issuance of a standing Offer.
Site Visit : Please contact Standing Offer Authority by e-mail if necessary to make an appointment
STANDING OFFER
A standing offer (SO) is an offer from a supplier to Canada that allows Canada to purchase goods and/or services, or a combination of goods and services, as and when requested, during a specific period of time, through the use of a call-up process which incorporates the conditions and pricing of the standing offer.
A standing offer itself is not a contract. A separate contract is formed each time a call-up for the provision of goods and/or services is made against a standing offer. When a call-up is made, it constitutes an unconditional acceptance by Canada of the supplier's offer for the provision, to the extent specified, of the goods and/or services described in the standing offer. Canada's liability is limited to the actual value of the call-ups made by the identified user(s) within the period the standing offer is valid.
Inability to Qualify: PWGSC will notify all suppliers who have not qualified and will indicate the reasons why their proposal was rejected.
This PWGSC office provides procurement services to the public in both official languages. / This PWGSC office provide procurement services in French and English.
The Crown retains the right to negotiate with suppliers on any procurement.
Documents may be submitted in either official language of Canada.
Delivery Date: Above-mentioned
The Crown retains the right to negotiate with suppliers on any procurement.
Documents may be submitted in either official language of Canada.