DELIVERABLES / SCOPE OF WORK
CCG has plans to deploy remote operated video surveillance equipment at LL 721 X32/2; an ATON location situated offshore in Lake St. Clair (near the downstream end of the St. Clair River); to monitor ice accumulation. The installation will be powered by the PV generation system detailed in Appendix B3 and currently installed at CCGs Electronics Workshop in Sarnia. It is the purpose of this contract to secure the supply and installation of the structural support assembly; as well as the installation of the solar equipment and related appurtenances.
Work under this Contract includes, but is not limited to, the provision of all labour, materials, and equipment required to:
Fabricate the steel structural support assembly in accordance with the Contract Drawings;
Mobilization to the project site with floating plant of appropriate capacity and configuration to execute the works;
Installation of the structural support assembly; and,
Installation of the PV system components.
The following work will be completed by CCG or others and is hereby excluded:
Supply of PV equipment and appurtenances; including:
Solar Panels;
Charge Controllers;
Batteries; and,
Enclosures.
Connection and commissioning of the PV generation system.
Installation of the system load and all appurtenances.
EXPECTED START AND COMPLETION DATES
The services of the Contractor will be commencing upon contract award. The expected completion date of this project is July 29, 2018.