The 2026 Farm Upgrades project includes the construction of two (2) stormwater management facilities (SWMF), turn-out pen, ditches, and the reconstruction of select granular roadways at the Lakeland College Farm in Vermilion, AB.
The Work generally consists of the following:
The work may commence on September 15, 2026 and the completion date shall be June 30, 2027.
The 2026 Farm Upgrades project includes the construction of two (2) stormwater management facilities (SWMF), turn-out pen, ditches, and the reconstruction of select granular roadwa...