Trade Agreement: Canadian Free Trade Agreement (CFTA)
Tendering Procedures: All interested suppliers may submit a bid
Competitive Procurement Strategy: Lowest/Lower Bid
Comprehensive Land Claim Agreement: No
Nature of Requirements:
EZ897-180975/A
Leung, Janie (PWY)
Telephone No. - (778) 919-3273
Fax No. - (604) 775-6633
Email: J••••••••@•••••.••.ca
Title:
LIF & Hydraulic Profiling Survey
Location:
Fireside and Muncho Lake Maintenance Camps, km 839 & km 698, Alaska Highway, BC
Work Description:
The Work covers the Laser-Induced Fluorescence (LIF) survey and Hydraulic Profiling survey at both the Fireside and Muncho Lake Maintenance Camps. The work includes, but is not limited to:
-Health and safety and environmental protection at Site. Contractor is responsible for utility location and protection at Muncho Lake and Fireside for the work.
- Pre-mobilization Submittals.
-Progress Submittals, including cash flow and forecasting.
- Complete the LIF Survey at Muncho Lake at the locations and to the depths specified by the Departmental Representative.
-Complete the LIF Survey at Fireside at the locations and to the depths specified by the Departmental Representative.
-Complete the Hydraulic Profiling Survey at Muncho Lake at the locations and to the depths specified by the Departmental Representative.
-Complete the Hydraulic Profiling Survey at Fireside at the locations and to the depths specified by the Departmental Representative.
-Complete ?Pre-probing? at Muncho Lake at the locations and depths specified by the Departmental Representative.
-Complete ?Pre-probing? at Fireside at the locations and depths specified by the Departmental Representative.
-Collect representative subsurface soil samples at Muncho Lake suitable for analytical testing at the locations and to the depths specified by the Departmental Representative.
Collect representative subsurface soil samples at Fireside suitable for analytical testing at the locations and to the depths specified by the Departmental Representative.
-Capture and collect all waste soil generated to complete the work into drums or other containers as approved by the Departmental Representative for long term storage on each of the respective work sites (Muncho Lake / Fireside).
-Sufficient number of drums to be supplied by the contractor for both the work and optional work.
-Closure Submittals.
-All ancillary activities required to complete Work.
Mandatory Requirements:
The Rig Operator MUST have a minimum of 2 years of cumulative direct push experience and previous demonstrated field experience advancing the LIF probe.
The LIF Operator MUST have a minimum of 6 months of cumulative demonstrated field experience advancing the LIF probe.
Site Visit:
There will be NO SCHEDULED SITE VISIT. However, contractors are encouraged to view the site on their own.
Delivery Date:
-Work to be initiated: within 5 Working Days of Contract Award.
-Pre-Mobilization Submittals: within 5 Working Days of Contract Award.
-Site Works: Final Completion no later than November 17, 2017.
-Completion of the Work: no later than December 15, 2017. Includes all final Submittals.
Enquiries:
Janie Leung, Supply Specialist
Tel: (778) 919-3273
Fax: (604) 775-6633
Email: J••••••••@•••••.••.ca
Value of Project:
To assist with bonding and insurance requirements, this project is estimated to cost between
$575,000.00 to $625,000.00.
Firms intending to submit tenders on this project should obtain tender (solicitation) documents through Buyandsell.gc.ca/tenders. Addenda, when issued will be available from Buyandsell.gc.ca/tenders. Firms that elect to base their bids on tender (solicitation) documents obtained from other sources do so at their own risk and will be solely responsible to inform the tender calling authority of their intention to bid.
This procurement office provides procurement services to the public in English.
Delivery Date: Above-mentioned
The Crown retains the right to negotiate with suppliers on any procurement.
Documents may be submitted in either official language of Canada.