This requirement is for the installation of power lines from the Acadia Research Centre
200 amp services is the minimum requirement.
Installation shall comply with all local electrical codes and standards as detailed in Section 3.
Poles and power line to be installed to a site located at 5.5 km from the Acadia Forestry Centre (refer to map and coordinates provided). Poles only from the new power line to be installed at AR road 6 at the entrance to the research tower with final pole on the East side of AR road 6.
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.
Suppliers who have won similar work from this buyer before.
Seguin Morris Inc. is the most likely incumbent, based on how often and how recently they have won this buyer’s work in this category. To displace them, expect to need a clearly stronger proposition or price.
Other federal contracts in the same classification, and who won them.
| Tender | Awarded to | Buyer | Value | Date |
|---|---|---|---|---|
| Electric Power Infrastructure Upgrade - Home Farm Charlottetown | Hansen Electric Ltd. | Agriculture and Agri-Food Canada | CAD $70.3K | 2022-04-27 |