The work includes upgrading 10.0 km of existing single phase, 7200 volt electrical distribution and constructing 1 km of new 1 phase electrical distribution. More specifically, the work includes, but is not limited to the following:
1. Remove existing, deteriorated utility power poles at 40 locations.
2. Provide and install new wooden utility power poles at 60 locations.
3. Provide and install new braced wooden cross-arms on new and existing utility power poles at 200 locations.
4. Provide and install new galvanized anchors at 10 locations.
5. Provide and install new down-guys at 15 locations.
6. Provide and install approximately 11 km of new 2/0 ACSR wire along the primary electrical distribution system.
7. Transfer dead-ends at 10 locations.
8. Transfer existing 1 phase primary and neutral wires to new utility poles at 40 locations.
9. Transfer switchgear as required.
10. Provide all hookups and ensure proper operation of the entire upgraded system.