This project is to upgrade the roof panels of Fish Pond Left Wing Structures, please see the drawings, scope of work and Spec in a separate document provided by a consulting engineer.
The construction schedule should not interrupt the Science Program on site.
The contractor will demonstrate to the project engineer during the final inspection that the Scope of Work is followed.
The contractor is to provide price to supply and install all labour, materials, permits, etc. for roof upgrades of Left Wing Fish Pond Structure.
The contractor will include the information about the warranty (period and items to be covered)
The contractor will provide the as-built drawings in one-week following the project substantial completion inspection.
A Mandatory Site Visit will be held on Friday June 24 2016.