NATURE OF WORK.1 In general, work consists of mooring system inspection and repairs of large concrete floating structures in Port Hardy Small Craft Harbour. The mooring systems are heavily covered in growth and require cleaning for inspection and repairs. Several mooring lines have conflicts and require protection with firehose. A few mooring lines (chain and rope) have completely failed and require full replacement. An anchor requires relocation. The Owner will provide specific scope for the day rate. Refer to the reference drawings for details about the mooring systems.
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.
10 past awards in this classification and 5 likely incumbents from this buyer. Pro shows who won and for how much.
Upgrade to Pro