Trade Agreement: Agreement on Internal Trade (AIT)
Tendering Procedures: All interested suppliers may submit a bid
Non-Competitive Procurement Strategy: Government Objectives
Representing Best Interests/Value to Govt
Comprehensive Land Claim Agreement: No
Vendor Name and Address:
Northern Transportation Company Limited
1209, 10104-103 Ave
Edmonton Alberta
Canada
T5J0H8
Nature of Requirements:
CCGS Eckaloo -Vessel Life Extension
F7049-150120/A
Anstey, Gregory
Telephone No. - (250) 363-0088
Fax No. - (250) 363-3960
g••••••••@••••••••.••.ca
Definition of the Requirement
Fisheries and Oceans Canada/Canadian Coast Guard has a
requirement for a Ship Repair Contractor to carry out the Vessel
Life Extension (VLE) on the Canadian Coast Guard vessel, CCGS
Eckaloo. The work will involve completing an extensive list of
repairs and modifications/upgrades as contained in the Statement
of Work that has been prepared for the Project. (The Table of
Contents from that work is posted below.)
Vessel Information
Name: CCGS Eckaloo
Type: Type 700 Special Nav Aids Tender
Class: Class 1 Minor Waters
Year Built: 1988
Principle Dimensions
Length: 49.0m
Breadth, molded: 13.4m
Loaded Draft: 2.3m
Tonnage: 212.00
Propulsion: Twin 3512-B Caterpillar Engines, 7261
Reduction/Reversible Gear Box, Twin Shaft, Fixed Propeller
Criteria for assessment of the Statement of Capabilities
(minimum essential requirements)
Any interested supplier must demonstrate, by way of a Statement
of Capabilities, that it meets the following requirements:
1 - Facilities and Equipment - Must have a facility capable of
docking, undocking and placing the vessel undercover for the
entire duration of the work period in a location near the
vessel's Home Port in Hay River, NWT.
2 - Manpower - Must be capable of providing enough skilled and
certified tradesmen to carry-out the work in accordance with the
requirements detailed in the Statement of Work and be able to
complete all the work in the period 20 October 2015 to 01 June
2016.
3 - Project Management Experience - Must be able to demonstrate
Project Management Experience in the area of Ship Refits and
Repairs by providing details of significant recent ship repair
projects including references that can verify the provided
information.
4 - Quality Management - In the performance of the Work
described in the Contract, the Contractor must comply with the
requirements of:
ISO 9001:2008 - Quality Management Systems - Requirements,
published by the International Organization for Standardization
(ISO), current edition at date of submission of the Contractor's
bid with the exclusion of the following requirement:
7.3 Design and Development.
It is not the intent of this clause to require that the
Contractor be registered to the applicable standard; however,
the Contractor's quality management system must address each
requirement contained in the standard.
5 - Insurance - The Contractor must obtain Ship Repairer's
Liability Insurance and maintain it in force throughout the
duration of the Contract, in an amount usual for a contract of
this nature, but for not less than $10,000,000 per accident or
occurrence. The Contractor must obtain Commercial General
Liability Insurance, and maintain it in force throughout the
duration of the Contract, in an amount usual for a contract of
this nature, but for not less than $10,000,000 per accident or
occurrence.
6 - Contract Financial Security - The Contractor must be able to
provide one of the following contract financial securities
within five (5) calendar days after the date of contract award:
EITHER
a) A performance bond (form PWGSC-TPSGC 505) and a labour and
material payment bond (form PWGSC-TPSGC 506), each in the amount
of 50% percent of the contract price. Any bond must be accepted
as security by one of the bonding companies listed in Treasury
Board Contracting Policy, Appendix L, Acceptable Bonding
Companies.
OR
b) A security deposit (as defined in Paragraph 4 below) to the
value of 10 percent of the contract price.
7 - Environmental Protection - The Contractor and its
sub-contractors engaged in the Work on a Canadian Government
vessel must carry-out the Work in compliance with applicable
municipal, provincial, and federal environmental laws,
regulations, and industry standards.
The Contractor must have detailed procedures and processes for
identifying, removing, tracking, storing, transporting and
disposing of all potential pollutants and hazardous material
encountered, to ensure compliance as required above.
All waste disposal certificates are to be provided to the
Inspection Authority or designate, with information copies sent
to the Contracting Authority. Furthermore, additional evidence
of compliance with municipal, provincial and federal
environmental laws and regulations is to be furnished by the
Contractor to the Contracting Authority when so requested.
The Contractor must have plans and procedures in place for oil
spill and other environmental emergency responses. Contractor
and subcontractor employees must have received the appropriate
training in emergency preparedness and response. Contractor
personnel engaging in activities which may cause environmental
impacts or potential non compliance situations must be competent
to do so on the basis of appropriate education, training and
experience.
Applicability of the trade agreement(s) to the procurement
This procurement is subject to the Agreement on Internal Trade
(AIT) and exempt from NAFTA [see Chapter 10, Annex 1001.2b,
paragraph 1 (a)] and from the WTO-AGP (see Annex 4).
Justification for the pre-identified supplier
The shipyard, operated by Northern Transportation Company
Limited (NTCL) in Hay River, is currently the only known
facility in the area capable of docking the CCGS Dumit and
moving the vessel into an enclosed structure for the duration of
the work period.
PWGSC policy allows for the work to be directed to one shipyard
if certain conditions exist. In this case, special operational
considerations of the client limit movement of the vessel beyond
a specified location.
This vessel's primary operational role is the installation and
removal of navigational buoys in the Mackenzie River system in
the NWT. The vessel is based at the Coast Guard base in Hay
River. At the close of the navigational season the vessel works
its way down the river picking up the buoys to avoid them being
damaged by ice and ends its trip in Hay River. The vessel
cannot navigate in ice conditions in the river as it is not ice
strengthened (i.e. it is not an icebreaker). Given the vessel's
operational requirements, it cannot be moved to another location
for work to be carried out.
Government contracts regulations exception(s)
The following exception(s) to the Government Contracts
Regulations is (are) invoked for this procurement under
subsection 6(d) - "only one person is capable of performing the
work").
Exclusions and/or limited tendering reasons
The following limited tendering reasons are invoked under the
section of the trade agreement specified:
i) Agreement on Internal Trade (AIT) - Article 12 b.
ii) Where there is an absence of competition for technical
reasons and the goods or services can be supplied only by a
particular supplier and no alternative or substitute exists.
Period of the proposed contract or delivery date
Work must commence on 20 October 2015 and be fully complete by
01 June 2016.
Name and address of the pre-identified supplier
Northern Transportation Company Limited
Suite 1209, 10104 - 103 Avenue
Edmonton AB T5J 0H8
Closing date for a submission of a statement of capabilities
The closing date and time for accepting statements of
capabilities is 16 September 2015, 2:00 pm PDT.
Inquiries and submission of statements of capabilities are to be
directed to:
Gregory D. Anstey
Supply Team Leader
CCG, Western Region, VLE/MLM Project
Pacific Region
Public Works and Government Services Canada
401-1230 Government Street, Victoria, BC, V8W 3X4
G••••••••@••••••••.••.ca
Telephone : 250-363-0088
Facsimile : 250-363-3960
TABLE OF CONTENTS OF THE STATEMENT OF WORK
GENERAL SECTIONS
G 1.0 General Notes
G 2.0 General Technical Reference
G 3.0 Paint Specifications
G 4.0 Eckaloo Hull Condition Survey - Lloyds
G 5.0 CCGS Eckaloo - Procedures for Asbestos Containing Systems
G 6.0 CCGS Eckaloo - Procedures for Lead Containing Systems
SERVICE SECTIONS
S 1.0 Services
HULL AND DOCKING SECTIONS
HD 1.0 Docking
HD 1.0A Appendix A to HD 1.0 - Docking Certificates
HD 2.0 Hull Repairs and Load Line
HD 3.0 Propeller Survey
HD 4.0 Stern Tube & Shaft Surveys
HD 5.0 Sea Chest Surveys
HD 6.0 Ship's Side Valve Replacements and Surveys
HD 7.0 Anode Replacements
HD 8.0 Underwater Hull Coatings
HD 9.0 Above Waterline Hull Coatings
HD 10.0 Ballast Tank Coatings
HD 11.0 Potable Water Tank Coatings
HD 12.0 Undocking
HD 13.0 Sea Trials
HULL SECTIONS
H 1.0 Tank Cleaning
H 2.0 Mast Removal
H 3.0 Tank Surveys
H 4.0 Steering Machinery Surveys
H 5.0 Intermediate Shaft Bearing Surveys
H 6.0 Anchor Windlass Survey
H 7.0 Anchor and Anchor Chain Survey
H 8.0 Aft Cranes Surveys
H 9.0 Main Crane Survey
H 10.0 Life Raft Replacements
H 11.0 CO2 System Hydrostatics
H 12.0 Fixed Fire System Inspection
H 13.0 Accommodation Flooring
H 14.0 Asbestos & HAZMAT Removal
H 15.0 Shaft Alignments
H 16.0 Mast Installation
MACHINERY SECTIONS
M 1.0 Steering Control Upgrade
M 1.0A Appendix A to M 1.0 Steering Control Upgrade
M 2.0 Gear Box Overhauls & Surveys
M 3.0 Air Compressor Renewals
M 4.0 Emergency Heat Exchanger Surveys
M 5.0 HVAC System Upgrade
M 5.0A Appendix A to M 7.0 HVAC System Upgrade
M 6.0 Refrigeration And Air Conditioning Annual Inspections
M 7.0 Hot Water Tank Replacements
M 8.0 Galley Dishwasher Replacement
M 9.0 Extended Spindle Valve Overhauls
M 10.0 Vibration Analysis
M 11.0 Hydraulic Equipment Upgrade
M 12.0 Helicopter Fire Fighting System Removals
ELECTRICAL SECTIONS
E 1.0 Ship Service Generator Installations
E 1.0A Appendix A to E 1.0 Ship Service Generator Installation
E 2.0 Electrical Switchboard Replacement
E 3.0 Electrical Insulation (Survey)
E 4.0 Baseboard Upgrades
E 5.0 Hold Heater Replacements
E 6.0 Motor Overhauls
E 7.0 Cold Start Generator
ELECTRONICS SECTIONS
EL 1.0 Fire Detection System Upgrade
EL 2.0 Bridge Electronics Upgrades
Delivery Date: Above-mentioned
You are hereby notified that the government intends to negotiate
with one firm only as identified above. Should you have any
questions concerning this requirement, contact the contracting
officer identified above.
An Advance Contract Award Notice (ACAN) allows departments and
agencies to post a notice, for no less than fifteen (15)
calendar days, indicating to the supplier community that it
intends to award a good, service or construction contract to a
pre-identified contractor. If no other supplier submits, on or
before the closing date, a Statement of Capabilities that meets
the requirements set out in the ACAN, the contracting authority
may then proceed with the award. However, should a Statement of
Capabilities be found to meet the requirements set out in the
ACAN, then the contracting authority will proceed to a full
tendering process.
Suppliers who consider themselves fully qualified and available
to provide the services/goods described herein, may submit a
statement of capabilities in writing to the contact person
identified in this Notice on or before the closing date of this
Notice. The statement of capabilities must clearly demonstrate
how the supplier meets the advertised requirements.
The PWGSC file number, the contracting officer's name and the
closing date of the ACAN must appear on the outside of the
envelope in block letters or, in the case of a facsimile
transmission, on the covering page.
The Crown retains the right to negotiate with suppliers on any
procurement.
Documents may be submitted in either official language of Canada.