SCOPE OF WORK
Work to be completed under this contract involves the removal of existing asphalt paving, reprofiling the grading of designated areas shown in the drawings, upgrading some drainage infrastructure (curbs, manholes, among others), and installing a new asphalt surface. The replacement must be performed as per the drawings and specifications provided.
The contractor must provide all the required materials, equipment before/during/after installation, and labour for installation, and manage the project requirements following the National Building Code of Canada.
Project progress meetings are required at regular intervals with the owner, consultant, and the contractor; the specific intervals will be determined in more detail at the kick-off meeting.
Further project details are contained in the project plans and specifications.
This project shall be completed by March 31, 2027.