Title
Phase 2 EZ899-270168 Penticton Airport Omni-Directional Approach Lighting System (ODALS) 16 Replacement
Reference number
WS5735638074-Doc5752062446
Solicitation number
WS5735638074
Publication date
2026-06-30
Tender closing date
2026-07-28T17:00:00
Expected contract start date
2026-08-04
Expected contract end date
2027-01-26
Unspsc
*39000000
*72141101
*72151500
*72151502
Unspsc description
*Electrical Systems and Lighting and Components and Accessories and Supplies
*Airport runway construction service
*Electrical system services
*Electric power system construction service
Procurement category
*CNST
Notice type
Invitation to Qualify
Procurement method
Competitive - Selective tendering
Selection criteria
Lowest Price
Trade agreements
*Canadian Free Trade Agreement (CFTA)
Regions of delivery
*British Columbia
Contracting entity name
Department of Public Works and Government Services (PSPC)
Contracting entity address line
11 Laurier St, Phase III, Place du Portage
Contracting entity address city
Gatineau
Contracting entity address province
Quebec
Contracting entity address postal code
K1A 0S5
Contracting entity address country
Canada
End user entities name
Department of Public Works and Government Services (PSPC)
End user entities address
11 Laurier St, Phase III, Place du Portage,Gatineau,Quebec,K1A 0S5,Canada
Contact info name
Allison, Rodnie (SPAC/PSPC)
Contact info email
rodnie.allison@tpsgc-pwgsc.gc.ca
Tender description
Work under this Contract includes, but is not limited to, the provision of all labour, materials, services, and equipment necessary for the replacement of the existing ODAL assemblies and replacement of related ODAL existing airfield lighting cable, and the cleaning pullbox systems from the existing regulator at FEC/IPU building to the flash-heads at airport field located at Penticton airport (3000 Airport Road, Penticton, BC V2A 8X1).
Work includes, but is not limited to:1.Replacing existing ODAL flashheads, power converters, isolation transformers and cabling.2.Replacement of airfield lighting cabling3.Opening, cleanout, and inspection of all pullboxes, handholes and vaults airside impacted with this scope of work.4.Disposal of redundant materials, cables, and soils as the result of the work noted.