5P468-24-0028/B Stage 2 - Tunnel Mountain Village 2 (TMV2) Shower Building HVAC Renovation, Banff National Park
REQUIREMENT
Parks Canada requires the supply, installation, and commissioning, of an HVAC system in a campground shower building. The building is a 4-season shower building, approximately 102m2 (1,100 f2) in size, circa 1981, and consists of 14 shower stalls, 2 washrooms, and 1 mechanical room spaces. The new HVAC system will provide heating, exhaust, air circulation/dehumidification and an automated control system.
TWO STAGE SELECTION PROCESS
This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings.
Only qualified suppliers have been invited to bid.