Parks Canada requires a Contractor to perform the work of the contract, including but is not limited to labour, materials, and equipment, for the Castle Campground Rehabilitation (Phase 3) project. The work consists of the installation of new campground water distribution pipes (tie-ins from existing stubs); sanitary force main and septic field; the decommissioning of existing overhead power and installation of new underground conduit (including directional drilling at creek); coordination with Fortis for new service installation and energization; tie-ins at existing new washroom building; box culverts installation; and site restoration works.
TWO STAGE SELECTION PROCESS
This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide further qualifications and a financial bid on the project based on the specifications and drawings.
Only qualified suppliers have been invited to bid.