5P468-23-0028/A Stage 2 - Dixon Bridge Replacement, Grasslands National Park
REQUIREMENT
Parks Canada requires replacement of the Dixon Bridge over the Frenchman River located in Grasslands National Park. Work includes a temporary bridge and road access, demolition, and replacement of the existing bridge & site restoration. Site is within Critical habitat, and under the EPO for Sage Grouse.
TWO STAGE SELECTION PROCESS
This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings. Only qualified suppliers have been invited to bid.
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.
0 past awards in this classification and 5 likely incumbents from this buyer. Pro shows who won and for how much.
Upgrade to Pro