5P468-23-0086/A Stage 2 - Hay Camp Culvert Replacement, Wood Buffalo National Park
REQUIREMENT
Parks Canada requires a contractor to remove and dispose of the existing washed-out culvert structures, supply, and install new culvert on Highway 58, and Hay Camp Road KM 41 in the Wood Buffalo National Park. The scope of work includes gravel haul, site preparation, removal and disposal of existing culvert, purchase, and installation of new culvert. All required works will be as per Alberta Specifications for Highway Construction.
TWO STAGE SELECTION PROCESS
This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings. Only qualified suppliers have been invited to bid.