5P468-25-0038/A Stage 2 - Spruce River Bridge and Bear Creek Culvert Repairs – Prince Albert National Park
REQUIREMENT
Parks Canada requires renovations to Spruce River Bridge and Bear Trap Road Culvert. Work at Spruce River Bridge work consists of timber bridge replacement of existing timber bracing on in-water pier, supply and installation of new timber members at abutments and in-water pier, and localized roadway patch repair including asphalt and new timber retaining planks. Work at Bear Trap Road Culvert includes replacement of timber headwall planks, supply and installation of timber piles, supply and installation of pile tie-back assemblies, associated earthworks including excavation and backfill, and supply and installation of W-beam guardrail.
TWO STAGE SELECTION PROCESS
This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings.
Only qualified suppliers have been invited to bid.