Tendarix.ca
BUSINESS NEWS
Q3-26 Canadian Business Outlook Survey: More firms plan cost pass-through· RBCGrowing the Oil and Gas Sector Helps Grow Canada’s Economy· Canadian Chamber of CommerceStorm Clouds Continue to Gather Over Canada’s Economy· EnergyNowPosthaste: U.S. businesses feel fresh pain from trade war with Canada, says this hot take on the economy· Financial PostEGAN: Canada Is Key to NH’s North Country Economy· NH JournalBusinesses want Federal Budget 2026 to help them compete from a position of strength· KPMG InternationalWhy business leaders are ‘cautiously optimistic’ about the upcoming federal budget· BNN BloombergWhat Canadian Businesses Must Embrace to Compete in a Volatile Global Economy· Open CanadaCanadian economy lost 68,000 jobs in September, marking second straight month of surprise declines· CBCCanada’s inflation data, business survey on tap ahead of BoC decision· RBCGlobal trade is changing how the Canadian economy works· Bank of CanadaEastern Canada business leaders call for ‘single economy’ between Atlantic provinces· Global NewsAtlantic Economic Panel unveils blueprint for Atlantic Canada’s future· Canada.caEastern Canada business leaders call for 'single economy' between Atlantic provinces· CastanetCF-Canada.Net Introduces an AI Digital Adoption Initiative to Help Canadian Small Businesses Navigate the AI Economy· EIN News
← All tenders
Environment Canada

Procédures de calcul de répartition du volume de la rivière Qu’Appelle à la frontière entre la Saskatchewan et le Manitoba

Request for Proposal (RFP)
Estimated value
Not disclosed
Deadline
August 8, 2016
Published
June 29, 2016
Type
Services

Full description

Background: The Prairie Provinces Water Board (PPWB) is the body that oversees the administration of the Master Agreement on Apportionment (MAA). Signed in 1969, the MAA is an agreement in place between Canada and the provinces of Alberta, Saskatchewan and Manitoba relating to the sharing of water in transboundary basins. The PPWB consists of representatives from Alberta, Saskatchewan, and Manitoba, as well as Environment and Climate Change Canada and Agriculture and Agri-Food Canada.
In order to facilitate collaboration on water sharing issues, the PPWB utilizes special committees related to various aspects of the MAA. The Committee on Hydrology (COH) is the committee that directly oversees aspects of the MAA related to water quantity, including the calculation of apportionable flows at the Alberta/Saskatchewan and Saskatchewan/Manitoba interprovincial boundaries.
Apportionable flow is the term used to describe the volume of water available at the boundary that is to be shared under the terms of the MAA. Apportionable flows are similar to naturalized flows in that they are an estimate of the volume of water that would have passed the interprovincial boundary under undeveloped conditions. They are, however, distinguished from natural flow in that they are calculated based on specific procedures that have been approved by the PPWB. These procedures are selected based on considerations such as data cost and availability, and the required level of accuracy for each basin. In striking this balance apportionable flow calculations may therefore not represent the same level of rigour that might normally be associated with a true natural flow estimate. Apportionable flow calculations, based on the PPWB approved calculation procedures, are completed by the PPWB Secretariat which is housed within the Transboundary Waters Unit of Environment and Climate Change Canada. Deviations from the approved apportionable flow calculation procedures are not permitted without approval of the Board.
The project depletion method is the name given to the apportionable flow calculation methodology that has been adopted by the PPWB for use in apportionment monitoring for most of the interprovincial basins. Project depletion method calculations are typically completed on a monthly time step. The method is based on adjusting the recorded flow at the apportionment point by adding and subtracting measured or estimated water inputs or withdrawals that have occurred within the basin. These include such things as: water put into or released from storage, evaporation losses from stored water, licensed water use, agricultural land drainage activities and inter basin diversions. All these items may also have routing adjustments applied to them to account for travel time between the location of their occurrence and the apportionment point.
Apportionment procedures for most basins were documented during the 1970s in a series of reports published by the PPWB. Some, but not all, basins have had additional studies. The apportionable flow calculations were subsequently moved into FORTRAN programs specific to each basin, which often resulted in modifications to the calculation procedures. An Excel workbook has been developed to complete the apportionable flow calculations for the Qu’Appelle River. The calculations in this workbook mirror the calculation procedures carried out by the former FORTRAN program.
In 2011 the PPWB COH embarked on a process of reviewing the apportionable flow calculation procedures for each of the basins subject to apportionment under the MAA. The COH’s target is that each basin will be reviewed approximately every ten years. The purpose of this review process is to ensure regular evaluation and improvement to the apportionable flow calculation procedures. Reviews for the North Saskatchewan River and Cold Lake at the Alberta/Saskatchewan boundary are complete and a review for the Saskatchewan River at the Saskatchewan/Manitoba boundary is underway. The Qu’Appelle River will be the fourth basin to undergo review.
The PPWB has recently begun utilizing a custom apportionable flow program called River Basin Assessment Tools (RBAT). The apportionable flow procedures recommended through this basin review will be implemented in the RBAT program. The Consultant completing the basin review will not be responsible for setting up the basin in RBAT, or require any knowledge in the use of this program, however, it is important to recognize that the use of this software may factor into the decision making process of the COH.

AI Analysis

Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.

Basic information

Reference
PW-16-00738319
Solicitation no.
K4E21-16-2000
Buyer
Environment Canada
Notice type
Request for Proposal
Method
Competitive - Open bidding
Procurement category
*SRV
Trade agreements
*North American Free Trade Agreement (NAFTA)
Estimated value
Not disclosed
Source
canadabuys

Classification & terms

GSIN
*E103A — *Water Quality Support Services

Delivery & regions

Regions of delivery
*Saskatchewan

Key dates

Published
June 29, 2016
Closes
August 8, 2016
Amendment no.
000

Contact

End-user
Environment Canada
Sign up free to see the contact details

Award history

2 past awards in this classification and 0 likely incumbents from this buyer. Pro shows who won and for how much.

Upgrade to Pro

Live tenders

Special Areas Board1 day left

Special Areas Board - Request for Proposal - One New MFWD Agricultural Tractor with Front End Loader and Three-Point Hitch

77 MATCHView →
Special Areas Board1 day left

Special Areas Board - Request for Proposal - One New MFWD Agricultural Tractor with Front End Loader and Three-Point Hitch

78 MATCHView →
Special Areas Board1 day left

Special Areas Board - Request for Proposal - One New MFWD Agricultural Tractor with Front End Loader and Three-Point Hitch

79 MATCHView →