The Correctional Service Canada requires an experienced contractor to replace an isolated and deteriorated section of watermain and re-establish a continuous looped water distribution system at Beaver Creek Medium Institution. The work will restore normal system flow, eliminate dead-end conditions, and reduce water hammer issues within the existing water distribution network.
Objectives:
A section of 200 mm watermain serving the Driftwood Building area was previously isolated following a failure beneath an existing concrete pad. The isolation interrupted the original looped water distribution system and created dead-end sections of watermain, resulting in water hammer issues. This project will replace the isolated section of watermain and restore the looped distribution system.
Deliverables:
The Contractor must:
a) Complete the demolition, excavation, trenching and removal of existing damaged watermain, and Complete the backfilling and restoration of the new watermain.
b) Complete the supply, instillation, tie in, disinfection, testing and commissioning of the new Watermain, and provide the project authority with applicable test results.
c) Provide all labour, materials, equipment, supervision, transportation, disposal services, permits, testing services, and incidentals necessary to complete the work as described.
d) Verify all existing conditions, dimensions, elevations, utility locations and tie-in requirements prior to commencing construction. No extras resulting from failure to verify site conditions will be considered.
e) Existing as-built drawings will be provided for reference. The Contractor must satisfy themselves as to the accuracy of the information provided and must field verify all locations, elevations, and existing utilities prior to construction