Title: Foundation and Tower Replacement – LL1450 Capstan Reef
Location: Rainy Lake, Ontario
The scope of work consists of the furnishing of all plant, labour, equipment, and material for the Foundation and Tower Replacement at Rainy Lake, Ontario. The work will be completed in strict accordance with the specification and accompanying drawings and subject to all terms and conditions of the Contract.
1.1 Description of Work
.1 Work under this Contract includes but is not limited to the provision of all labour, materials, and equipment required to:
.1 Mobilize to site with a work barge of appropriate size and certification;
.2 Clearing of rubble to expose bedrock.
.1 CCG staff will be on site to determine appropriate location for new tower.
.3 Install one [1] new concrete pier;
.1 Bidder may assume water depth of 0.610 m for bidding purposes.
.4 Scheduling of concrete testing by CCG acquired third party firm.
.5 Transportation and installation of one [1] new CCG supplied aid to navigation (AtoN) tower;
.6 Salvage and return of the existing tower, complete with all appurtenances to CCG Base Parry Sound;
.7 Demolish and dispose of existing pier; and
.8 Demobilize.
.2 The following work will be undertaken by others and is hereby excluded:
.1 Supply one [1] ATON tower;
.1 Tower is to be transported to site from staging location by contractor.
.2 Supply and installation of lantern, battery and solar panel onto new ATON tower.
FAMILIARIZATION WITH SITE
Before submitting a bid, bidders can visit the site and its surroundings, at their own expense and schedule, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply.
Contractors, bidders, or those they invite to site are to review specification section on Health and Safety before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid.
Bidders that wish to visit the site must send an email to B••••••••@•••••••.••.ca and provide the following information:
a. Business name
b. Business address
c. Business phone number
d. Bidder’s representative name
e. Bidder’s representative email address