The Canadian Space Agency intends to retain the services of a contractor, qualified to practise and holding a Quebec permit, to provide the necessary services in order to replace a 50 kVa UPS at the John H. Chapman Centre.
Clarifications raised during the optional visit:
The TECK for the temporary installation must be dismantled after the work as shown in the plans and specifications.
The existing UPS which will be dismantled will not be recovered by the customer. It is the contractor's responsibility to remove it from the site.
The cuts must be coordinated with the project authority 48 hours in advance. The cuts must last a maximum period of 4 hours.
The interior dimension of the doors to go through is approximately 34".
The temporary circuit breaker must be dismantled after the work as shown in the plans and specifications.
Amendment 2
An addendum has been added as an attachment to provide some clarifications. Please consult the file entitled: RFP 9F030-20200522 - Amendment 2 - 2020-134-1001-ADD-ELE-001-E.pdf