The two compressors (including oil/water separator and receiver tank) have to fit into a space that is 84” wide x 144” deep and 82” high, to be able to use the existing allocated footprint. In addition, it has to run on 575V, three phase, 60 Hz which is supplied to the area in Room 281.
This project will include removal and disposal of existing equipment and placement of new equipment. All cost for piping, electrical and moving equipment must be included.
The compressors must meet NRC’s safety requirements by having UL/CUL certified electrical panel, be able to meet UL/CSA electrical requirements for components and wiring, integral safety enclosure and TSSA certified.
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.
Suppliers who have won similar work from this buyer before.
Biarritz Construction Inc. is the most likely incumbent, based on how often and how recently they have won this buyer’s work in this category. To displace them, expect to need a clearly stronger proposition or price.