Work under this Contract include but is not limited to the provision of all labour,
materials, and equipment required to:
.1 Mobilize to site with a work barge of appropriate size and certification;
.2 Install one new three pile dolphin;
.3 Install CCG supplied equipment on this dolphin;
.1 8’ x 10’ Galv. steel platform
.2 12’ tower and equipment
.3 2 sections of galvanized steel access ladder
.4 2 Hanging anode assemblies
.4 Demolish and dispose existing pile supported reinforced concrete pier;
.5 Return the existing aid to navigation including all lighting and electrical
equipment to CCG;
.6 Demobilize.