Shoreline Protection Repairs – Phase 2
Musgrave Harbour, NL
C2-00752
The scope of work for this project is the provision of construction activities for Phase 2 for the shoreline protection repairs at Musgrave Harbour, NL.
1. Complete removal of the existing armour stone in the locations noted on the drawings to facilitate new work. Note that the existing stones removed can be re-used in the new work if it meets the size and requirements specified. Salvage, stockpile and sort all existing stones to be re-used. Excess stones, or stones that do not meet the specified requirements, to be disposed of on-site at a location approved by the Departmental Representative.
2. Remove existing topsoil and grass along shoulder of road and toe of armour stone,asindicated on the drawings.
3. Remove any debris and side cast any accumulated sea vegetation (kelp) from area of new work, as indicated on the drawings.
4. Supply and install new rock core, geotextile, filter stone and armour stone, as shown on the drawings.
5. Regrade, level and compact existing road shoulder, as indicated on the drawings. Supplement with and install granular base if required.
6. Contractor shall contact NF Power prior to start of work to obtain an Energized Power Line Permit. Coordinate all work with NF Power and ensure all requirements for working near poles and power lines are met.
7. This is an active fishing site, therefore, contractor shall coordinate work as necessary as not to disrupt ongoing activities in the uplands area. Maintain full vehicle and vessel access to adjacent roadways and wharfs at all times. Provide and maintain temporary traffic control devices with flag operators, if required, to approval of Departmental Representative and all other governing authorities.
The Contractor must perform and complete the Work by March 31st , 2025.