Wharf Repairs, Leading Tickles, NLThe scope of work for this project consists of the furnishing of all plant, labour, equipment and material for wharf repairs, in Leading Tickles, NL in strict accordance with specifications and accompanying drawings and subject to all terms and conditions of the Contract.In general, the work under this contract will consist of, but will not necessarily be limited to, the following:.1 Demolition of the existing wharf crib infrastructure on the east end of the marginal wharf, in the area indicated on the drawings. Demolition and removal of fenders, ladders, wheelguard, wheelguard blocking and partial deck removal is also required in other areas of the site, as shown on the drawings. Note that any creosote timber will have to be disposed of at a Provincial Waste Disposal Facility such as Norris Arm, NL..2 Construction of new treated timber cribwork on the east end of the marginal wharf, complete with reinforced concrete deck to the dimensions indicated on the drawings..3 Supply and installation of mooring cleats, pole, structural timber for coping, wheelguard, wheelguard blocking, fenders, ladders, chase for electrical conduit and associated hardware for new crib section of wharf and throughout the facility where repairs are required as noted on the drawings..4 Relocation of an existing jib crane, as noted on the electrical drawings..5 Electrical work as indicated on the drawings.FAMILIARIZATION WITH SITEBefore submitting a bid, bidders can visit the site and its surroundings, at their own expense, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure, and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies, and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply.Contractors, bidders, or those they invite to site are to review specification Section 01 35 29 – Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid.