Tendarix.ca
BUSINESS NEWS
Storm Clouds Continue to Gather Over Canada’s Economy· EnergyNowVIDEO: Poilievre outlines economic priorities at Medicine Hat town hall· CHAT News TodayDeloitte Canada cuts GDP growth forecast by 20% as tariffs grip economy amid Trump's trade war· CBCDeloitte expects slowing pace of economic activity in Canada into 2027· Financial PostCanada’s economic Achilles’ heel is its regulations. The Building Canada Strong Act may change that· Business Council of CanadaGlobal trade is changing how the Canadian economy works· Bank of CanadaNew research finds electrifying Canada could add $3 trillion to the economy· ReNew CanadaDeloitte slashes 2027 economic outlook by 20% as trade tensions worsen - National· Global NewsHoles In Value Chains Are Holding Back Five Sectors That Have The Potential To Reshape Canada’s Economy For The Better· Canadian Chamber of CommerceSoft economy should limit Bank of Canada’s rate hikes: Capital Economics· Toronto StarAerospace firm plans $30M rocket engine test facility in London· London Free PressEconomic growth flattens in July as ‘broader volatility’ sets in· The Globe and MailCanada to fast track oil pipeline designed to diversify economy away from US· ReutersEastern Canada business leaders call for 'single economy' between Atlantic provinces· CastanetCanada’s Productivity Push: Could Ottawa’s New Investment Strategy Accelerate Economic Growth and Business Spending?· kalkine.ca
← All tenders
Mitchell Palmer

Réseau canadien de surveillance de l'air et des précipitations – Chapais, Québec.

Request for Proposal (RFP)
Estimated value
Not disclosed
Deadline
January 2, 2025
Published
December 5, 2024
Type
Services
Explore similarEnvironmental ServicesQuebec

Full description

1. Objective
Environment and Climate Change Canada (ECCC) requires a Contractor for weekly technical support (1 day per week, 52 weeks per year) at the Canadian Air and Precipitation Monitoring Network (CAPMoN) Chapais site located in Quebec with coordinates N 49.822361° latitude, W 74.975472° longitude.

2. Background
Environment and Climate Change Canada operates an environmental research and monitoring station in the area which forms part of Environment and Climate Change Canada’s national network of CAPMoN stations. The primary focus of this monitoring station is the weekly collection of precipitation and/or air samples. Environmental data is collected from both automatic and manual samplers. A contract operator is required to attend to the station to retrieve and process the samples according to the CAPMoN Standard Operating Procedures (SOP's). The samples are then packaged and shipped for analysis to the CAPMoN National Laboratory located in Toronto, Ontario. Other daily duties include reading and recording of various gauges, diagnostics, and regular servicing, troubleshooting, and minor repair of a variety of monitoring equipment. On-site training will be provided by Environment and Climate Change Canada (ECCC) technical staff.

3. Details of Work to be Performed

The instructions outlined in the statement of work for this contract is of a general nature. All sampling, shipping, and maintenance must be performed in accordance with the Site Operations Reference Manuals; and in accordance with any amendments to the aforementioned manuals. The routine may involve additional collectors, passive samplers and various climatological and meteorological instruments. ECCC will provide the Contractor the aforementioned manuals and amendments.

4. Tasks and Deliverables

Firm Requirement:

1. The Contractor will be responsible for servicing:
a. Precipitation Collector
b. Air Filter Sampling System
c. Ozone Sampling System
d. AEROCAN CIMEL Instrument

Refer to Appendix A of Annex A.

2. The Contractor must package and ship by courier to the designated Laboratory as outlined in Appendix A to Annex A. The Contractor will be supplied with preprinted manifests and must ensure the samples are delivered to or picked up by the designated courier. Sample containers will be sent to the Contractor by the most economical means and may need to be picked up at the nearest Canada Post office. The Contractor is not responsible for shipping expenses.

3. First level maintenance, diagnosis of problems, and minor repairs to equipment is often required of the Contractor. This may include, but is not limited to:

  • Cleaning of equipment
  • Replacement of Defective parts
  • Resetting or rebooting electronic systems
  • Replacement and setup of operational unit with backup unit
  • Checking and readjustment of various parts or software parameters as needed.

The Contractor is responsible for the physical shipping and receiving of replacement equipment as required. The Contractor is not responsible for shipping expenses.

4. The Contractor is responsible for routine site maintenance including keeping the sample hut clean, clearing the snow off the sampling hut stairs and deck, and grass cutting to keep the vegetation within the fenced or designated compound area at an acceptable height. The general cleanliness of the immediate sampling location is the responsibility of the contractor, including the removal of garbage/waste from the site.

These tasks must be carried out in proximity of sensitive and expensive research and monitoring equipment and it is essential that the Contractor understand the need to avoid adverse effects on the measurements and data.

AI Analysis

Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.

Basic information

Reference
cb-773-32074143
Solicitation no.
5000082780
Buyer
Mitchell Palmer
Notice type
Request for Proposal
Method
Competitive - Open bidding
Procurement category
*SRV
Trade agreements
*None
Estimated value
Not disclosed
Source
canadabuys

Classification & terms

UNSPSC
UNSPSC 77000000 — Environmental Services

Delivery & regions

Province
Quebec
Regions of delivery
*Canada
Contract term
April 1, 2025 → December 31, 2027

Key dates

Published
December 5, 2024
Closes
January 2, 2025
Amendment no.
001

Live tenders

Department of the Environment (ECCC )1 day left

Technical Assessment and Cost-Benefit Analysis on Fuel Storage Tank Systems Life Cycle (Installation, Maintenance and Removal)

Services
79 MATCHView →
Rocky View County1 day left

Rocky View County - RFP 26-015 Environmental Master Plan Background Research

77 MATCHView →
Department of the Environment (ECCC )6 days left

Science-Policy Frameworks for Nationally Coordinated, Place-Based Freshwater Macroplastics & Microplastics Monitoring in Canada

Services
81 MATCHView →