Trade Agreement: WTO-AGP/AIT
Tendering Procedures: All interested suppliers may submit a bid
Attachment: YES (MERX) Electronic
Competitive Procurement Strategy: Lowest/Lower Bid
Comprehensive Land Claim Agreement: No
Nature of Requirements:
REMEDIATION OF CONTAMINATED SEDIMENT AT THE PORT OF GASPE-SANDY
BEACH (QUEBEC)
SUMMARY:
Over the last 15 years, the sea floor in the area adjacent to
the wharf at the Port of Gaspé- Sandy Beach has undergone
characterization studies and a toxicological and
ecotoxicological risk assessment. Characterization studies of
the sea floor have brought to light a contaminant plume of
copper (Cu), with the highest concentrations found immediately
south of the wharf and a decreasing concentration gradient to
the east, extending as far as the point on the Sandy Beach
sandbar to the northeast. These same studies have also brought
to light the presence of an area around the wharf that is highly
contaminated with polycyclic aromatic hydrocarbon (PAH), within
a radius of approximately 300m
Ecotoxicological studies have helped to establish the Integrated
Effect Levels, or IEL, for sediment in the area of the wharf at
the Port of Gaspé - Sandy Beach. The IEL are defined as the
criteria for restoration of the seafloor; specifically, this
means 2,400mg/kg for copper and 5mg/kg for total PAH.
In order to remove the contaminated sediment that exceeds this
criterion, Transport Canada proposes to dredge the contaminated
sediment and conduct the final onshore management of dredged
material offsite. The volume of contaminated sediment to be
dredged, including both required and optional work, totals
approximately 27,330m3 in place, to which additional dredging
may be added (approximately 2,500m3). Based on available
characterization studies, Transport Canada has established
eleven (11) dredging polygons. These polygons are defined by a
dredging thickness and horizontal limits.
Transport Canada's objective is to remediate the seafloor in the
sector adjacent to the wharf in the Port of Gaspé-Sandy Beach
while minimizing the environmental impact of the work. The
achievement of dredging is planned from July 2015 and if
required, may be completed during 2016. All project work,
including dredging and final materials management, must be
completed before the end of 2016.
BIDDER'S CONFERENCE
A bidders' conference will be held at PWGSC'S on office at 1550
D'Estimauville Avenue, Quebec City (Quebec), G1J 0C7, on August
26, 2014. The conference will begin at 09:00, in the
multifonctional room. The scope of the requirement outlined in
the bid solicitation will be reviewed during the conference and
questions will be answered. It is recommended that bidders who
intend to submit a bid attend or send a representative.
Bidders are requested to communicate with the Contracting
Authority before the conference to confirm attendance. Bidders
should provide, in writing, to the Contracting Authority, the
name(s) of the person(s) who will be attending and a list of
issues they wish to table no later than August 20th, 2014..
Any clarifications or changes to the bid solicitation resulting
from the bidders' conference will be included as an amendment to
the bid solicitation. Bidders who do not attend will not be
precluded from submitting a bid.
INQUIRIES
All enquiries regarding this solicitation are to be submitted in
writing to Francois Thellend by email at
f••••••••@•••••.••.ca or by fax at (418) 648-2209.
SECURITY REQUIREMENTS:
This solicitation contains no security requirements.
LANGUAGES
This PWGSC office provides acquisition services to the public in
both official languages.
Ce bureau de TPSGC fournit des services d'achat au public dans
les deux langues officielles.
Documents may be submitted in either official language of Canada
Delivery Date: Above-mentioned
The Crown retains the right to negotiate with suppliers on any
procurement.
Documents may be submitted in either official language of Canada.