SUPPLY AND INSTALLATION OF ONE 1 800 mm DIAMETER SMOOTH WALL STEEL PIPE CULVERT by the boring method through the Roadway on Highway No. 3, 13.56 km east of its junction with Highway No. 23; for a TOTAL LENGTH OF 26 m.
Bidders shall submit all inquiries pertaining to the Bid Package documents a minimum of 3 business days prior to close of bidding directed to:
Ministry of SaskBuilds and Procurement
[email protected]
Bidders may request a debriefing session from Ministry of SaskBuilds and Procurement by emailing [email protected] within 30 days after the award notification date. The intention of the debriefing is to aid the Bidder by identifying areas of improvement that may be applied to subsequent procurement opportunities.
Fourniture et installation d’un tunnel en acier à paroi lisse de 1,8 m de diamètre, 26 m de long, foré sous l’autoroute 3 au Saskatchewan. Convient aux entreprises capables de fabriquer et poser de grands tunnels en acier.
Obtenez un résumé en langage clair de cet appel d'offres — ce qu'ils demandent, qui peut soumissionner, comment l'aborder et des conseils pour les petits fournisseurs. Quelques secondes suffisent.