Tendarix.ca
BUSINESS NEWS
A new chapter in Canada-India economic relations· Business Council of CanadaQ3-26 Canadian Business Outlook Survey: More firms plan cost pass-through· RBCStaying in Canada is a 'huge relief' for Alberta business leaders· CBCStorm Clouds Continue to Gather Over Canada’s Economy· EnergyNowPosthaste: U.S. businesses feel fresh pain from trade war with Canada, says this hot take on the economy· Financial PostWhat Canadian Businesses Must Embrace to Compete in a Volatile Global Economy· Open CanadaCanadian business confidence weakens after U.S. trade talks collapse, BoC says By Investing.com· Investing.com CanadaEGAN: Canada Is Key to NH’s North Country Economy· NH JournalCanada’s inflation data, business survey on tap ahead of BoC decision· RBCGlobal trade is changing how the Canadian economy works· Bank of CanadaEastern Canada business leaders call for ‘single economy’ between Atlantic provinces· Global NewsEastern Canada business leaders call for 'single economy' between Atlantic provinces· CastanetAtlantic Economic Panel unveils blueprint for Atlantic Canada’s future· Canada.caRegina business leaders to hear outlook on Canada's economy· SaskToday.caSoft economy should limit Bank of Canada's rate hikes: Capital Economics· BNN Bloomberg
← All tenders
Smoky Lake County

Smoky Lake County - Request for Proposal - HWY 28/63 Regional Water Commission Pipeline Condition Assessment and Renewal Prioritization Study

Request for Proposal (RFP)
Estimated value
Not disclosed
Deadline
October 21, 2026
Published
October 7, 2026
Type
Request for Proposal (RFP)
Explore similarEngineering and Research and Technology Based ServicesAlberta

Full description

The Highway 28/63 Regional Water Services Commission invites proposals from qualified consultants to complete a Regional Water Pipeline Condition Assessment and Renewal Prioritization Study.
The Commission’s regional system includes more than 200 kilometres of waterlines and associated infrastructure. The study will assess infrastructure condition, performance and risk and establish a prioritized 25-year capital renewal plan to support reliable water service, long-term financial planning and future funding applications.
The scope includes:
1) Reviewing available drawings, asset records, operating information, maintenance records, leak history and hydraulic information.
2) Developing an editable GIS inventory for pipelines and related linear assets and an Excel register for facilities, pumps, mechanical equipment, electrical systems, instrumentation, controls and structural components.
3) Conducting visual condition assessments of accessible infrastructure and identifying immediate concerns, urgent repairs and information gaps.
4) Assessing asset criticality, likelihood and consequences of failure, remaining useful life and renewal priorities.
5) Preparing planning-level replacement cost estimates and forecasts for repair, rehabilitation, replacement and other identified improvements.
6) Developing unconstrained and prioritized 25-year investment forecasts that consider risk, available funding and other capital needs.

  • Facilitating workshops with Commission representatives to review risk criteria, findings and investment priorities.
  • Preparing a draft report, presenting findings and delivering a final report with editable inventories, supporting calculations and investment forecasts.

The base scope consists of records review, visual inspections and planning-level analysis. Additional testing, detailed hydraulic modelling, detailed engineering design and construction services must be identified and priced separately if proposed.
Proponents should demonstrate relevant experience with regional potable water systems, infrastructure condition assessments, GIS asset inventories, risk analysis and capital renewal planning. Proposals must include the proposed methodology, project team, relevant experience, schedule, detailed fees, assumptions and exclusions.
The anticipated project duration is approximately six months from authorization to proceed. Refer to the RFP document for submission instructions, closing details, evaluation criteria and complete requirements.

AI Summary

The Highway 28/63 Regional Water Services Commission invites proposals from qualified consultants to complete a Regional Water Pipeline Condition Assessment and Renewal Prioritizat...

AI Analysis

Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.

Basic information

Reference
2026005
Buyer
Smoky Lake County
Method
RFP
Estimated value
Not disclosed
Source
alberta

Classification & terms

UNSPSC
UNSPSC 81000000 — Engineering and Research and Technology Based Services

Delivery & regions

Province
Alberta

Key dates

Published
October 7, 2026
Closes
October 21, 2026

Live tenders

Department of Natural Resources (NRCan)1 day left

Notice of proposed procurement (NPP)

Services
78 MATCHView →
Department of Public Works and Government Services (PSPC)1 day left

EW038-270709 - Northern Innovation Centre Conceptual Design Study – RFP

Construction
77 MATCHView →
Epcor1 day left

Epcor - Request for Proposal - EDTI EMS Training and Operational Workflow Development

75 MATCHView →