OVERVIEW OF AUTOMOTIVE INDUSTRY SECTOR IN CANADA
I. INTELLECTUAL PROPERTY & CONFIDENTIALITY
Intellectual Property
Environment Canada has determined that any intellectual property arising from the performance of the work under this Contract will be vested in Canada on the grounds that the main purpose of the Contract, or of the deliverables contracted for, is to generate knowledge and information for public dissemination (section 6.4.1 of the Treasury Board of Canada Secretariat Policy on Title to Intellectual Property Arising under Crown Procurement Contracts).
Confidentiality
It is understood and agreed that the Contractor shall, during and after the effective period of the ensuing contract, treat as confidential and not divulge, unless authorized in writing by the Departmental Representative or his/her delegate, any information obtained in the course of the performance of the ensuing contract.
Subject to the Access to Information Act, R.S. 1985, c.A-1, the parties agree that the terms of this Agreement are confidential and each party shall use the same degree of care to prevent disclosure of the terms of this Agreement to third parties as it uses to protect its own confidential information of similar nature. Any failure of the Contractor to respect the confidentiality obligations is a default of the Contractor for which the Minister may terminate the contract.
II. BACKGROUND
On December 8, 2006, the Prime Minister, along with the Ministers of the Environment and Health, unveiled the first phase of Canada's Chemicals Management Plan (CMP I). The plan takes immediate action to regulate chemicals that are harmful to human health or the environment.
A key element in CMP I was the collection of information on the properties and uses of the approximately 200 chemical substances identified through the categorization process as high priorities for action. This information is used to make decisions regarding the best approach to protect Canadians and their environment from risks these substances might pose. This initiative, known as the "Challenge", was announced in a Notice published in the Canada Gazette.
In October 2011, the Government of Canada announced the launch of the second phase of the Chemicals Management Plan (CMP II) to continue its commitment to protecting the health and environment of Canadians. As part of the second phase of the CMP, approximately 500 substances in nine groups have been identified as priorities for action. These nine groups of substances are planned to be assessed and, if necessary, managed for potential risks to human health and the environment.
As a major user of chemicals, the automotive industry sector is one of the industries impacted by the CMP. The industry has also been actively engaged in various environmental initiatives that aim to minimize exposure to chemicals such as energy conservation, reduction of VOC emissions, development of environmental management systems, and reduction of water use and waste, etc.
The Canadian automotive industry is challenged with respect to the implementation of the CMP due to number of factors:
The automotive production is a major component of Canada's manufacturing sector, accounting for large shares of cross-border trade, manufacturing sales and manufacturing gross domestic product. In 2012, the automotive industry sector employed 115,000 persons in Canada, which represented 7.7% of all manufacturing jobs in the country. Of this total, 64,300 employees were in parts manufacturing, 37,200 were in motor vehicle manufacturing and the remaining 13,600 were in motor vehicle body and trailer manufacturing .
III. PURPOSE
To improve Environment Canada’s understanding of the automotive sector by performing a review of environmental and health issues related to the use, release and exposure to hazardous chemicals and identifying best practices/forums within the sector addressing chemicals management and related issues.
For the purpose of this contract, the automotive industry sector includes:
IV. OBJECTIVES
The study must achieve the following:
1. Develop a Canadian automotive industry sector profile including:
o Size and geographical distribution of the industry per revenue, number of employees, number of establishments, type of automotive products and quantity, market perspective and evolution. This data must also be broken down for each tier.
o Products characterization
o Economic trends over the past 10 years and future economic outlook for the 5 coming years.
2. For substances listed in schedule 1 of the Canadian Protection Environmental Act 1999 as well as substances currently assessed or risk managed under the CMP (Challenge and the Groupings initiatives):
o map the supply, distribution, use, exposure and emission during the lifecycle of a vehicle from lower tier manufacturing of parts to end-of-life (ELV) processing;
o identify emerging industry trends and pollution prevention opportunities; and,
o compare levels of risks of releases and exposure at all stages of the vehicle life cycle.
3. Provide a review of industry driven information exchange tools that could provide insight into the chemical content of automotive products. This includes a description of these tools and their relevance and limitations regarding data gathering initiatives under the CMP;
4. Provide a comprehensive review of existing control measures and practices in Canada, U.S., European Union and Asia (Japan and South Korea) which aims to reduce health and environmental impacts of toxics used in the automotive sector.
5. Provide a review of existing industry driven tools that aim to better design automotive products by optimizing chemical selection and minimizing issues associated with ELV processing. This includes a description of these systems, their relevance and limitations regarding the future risk management activities under the CMP.
6. Articulate roles and responsibilities between various tiers within the automotive sectors and supportive industries (plastics, rubber, electronics, paints, etc.) regarding the chemical content of automotive parts or products used as part of the automotive manufacturing processes.
7. Identify existing government-industry practices/forums in Canada, U.S, European Union and Asia (Japan and South Korea) which aim to engage with the automotive industry in addressing environmental issues.
V. STATEMENT OF WORK
In order to achieve the objectives outlined above, the contractor must complete all the tasks described and provide the results of this research to the Departmental Representative in the form of a written report and an oral presentation.
This list of tasks is comprehensive, but may not necessarily be exhaustive. The Contractor is encouraged and expected to provide any additional information discovered during the contract period that is deemed relevant in fulfilling the objectives of this contract.
All the economic information must be provided in Canadian dollars. When monetary estimates are not available in Canadian dollars, foreign currency estimates must be converted and presented in Canadian dollars accompanied by an explanation of the exchange rates used.
Use of Canadian data should be prioritized over those from foreign sources (e.g., United States and European Union). When only foreign data is available, the Contractor should extrapolate the data for the Canadian market and support the extrapolation with valid assumptions (e.g., based on GDP, market share and demand in North America). All assumptions must be validated by two (2) industry experts.
A clear explanation of any assumptions used and calculations made must accompany any data provided.
Tasks:
The Contractor shall complete the following tasks:
Task 1: Information Gathering
Through interviews with key stakeholders and a literature review, the contractor must gather relevant information to achieve objectives of the study. The contractor must undertake at least the following steps:
o Socio-economic data on the Canadian automotive industry including a breakdown by OEMs, automotive part manufacturers and after market;
o Environmental and health issues associated with the automotive industry including risks and exposure of chemicals of concern within the automotive industry;
o Use pattern of chemicals of concern within the automotive industry;
o Existing control measures and practices in Canada, U.S., European Union and Asia (Japan and South Korea) which aims to reduce health and environmental impacts of toxics used in the automotive sector.
o Best management practices driven by industry with respect to substances of concern; and
o Existing supply chain management practices.
Information gathered throughout this task must be relevant to complete the subsequent tasks.
Task 2 – Sector profile
Develop a sector profile of the Canadian automobile industry including:
o Association name, purpose, mission, key members, number of members, contact information name, etc.).
Task 3 – Environmental and health issues Scan .
In order to examine opportunities for integrated and sustainable pollution prevention actions, a comprehensive review of the environmental and health issues associated with the automotive sectors must be completed by the Contractor both from the manufacturing operations, through the vehicle life cycle to identify any exposure and releases, wholly or partially resulting from the automotive industry sector activities or products.
These aspects include automotive parts manufacturing (for both ultimate use by original equipment manufacturers as well as for use as replacement parts).
This environmental review must include:
Graphics such as process flow diagrams, narrative, and analysis of the main processes in both automotive assembly and automotive parts manufacturing operations in Canada must support the environmental review.
Task 4 – Identification and description of existing government-industry best practices/forums in Canada and the U.S which aim to engage with the automotive industry in addressing environmental issues
To complete this task, the contractor must:
VI. INFORMATION SOURCE REQUIREMENTS
The primary objectives of interviews are to fill data gaps from the literature review and obtain stakeholders’ feedback. Therefore, the contractor must have exhausted all other possible methods of gathering the required information before contacting industry or industry associations with specific questions.
Prior to contacting stakeholders, the Departmental Representative must review the content of interview questions and contact lists. The Contractor is responsible for developing a contact list and ensuring the accuracy and completeness of the information. If available, the Departmental Representative may provide additional contact information to the Contractor. If needed, Environment Canada will also provide a letter to help the Contractor gather data from stakeholders.
Any information and reports provided to the Contractor by Environment Canada are to be treated as confidential. The information and documentation provided must only be used for the purpose of this contract and shall not be used for any other purposes unless duly authorized, in writing, by the Department Representative.
The Contractor must keep a record of discussion following any communication with industry. These records must contain the industry contact information, the subject of discussion, the questions posed or raised during the discussions, and any feedback received on the subject. The final report must include a list of persons contacted while gathering the information as well as their contact information including email addresses if available.
VII. DELIVERABLES AND SCHEDULE
Regular feedback (at least every two weeks) through email, and/or phone calls must be maintained between the Contractor and the Departmental Representative.
The Contractor shall provide the following deliverables:
Deliverable #1 – Revised detailed methodology and work plan: Based on discussions with the departmental representative during the initial meeting, the contractor must provide a final methodology and work plan
This document must describe, in details, the methodology and the work plan with respect to requirements outlined in Tasks 1 to 4. This document must also reflect interactions with the departmental representative during the initial meeting.
Environment Canada will review this document and provide comments to the contractor within (1) week after receiving the document.
Deliverable #2 – Draft Table of Contents: The Contractor must provide a draft Table of contents which describes the structure of the proposed and the content of the final report and a comprehensive bibliography that will support the study.
This must describe the structure of the proposed content of the report including an executive summary. The titles of chapters, sections and subsections must be indicated with a brief description of their contents, and how they link to requirements of tasks 2, 3 and 4.
Environment Canada will review and provide comments to the Contractor within three (3) working days after receiving the documents.
Deliverable #3 – Final Table of Contents: The Contractor must address and incorporate all the Departmental representative’s comments on Deliverable #2 in the Final Table of Contents.
This must describe the structure of the proposed content of the final report including an executive summary. The titles of chapters, sections and subsections must be indicated with a brief description of their contents, and how they link to requirements of tasks 2, 3 and 4. This document must also include a comprehensive bibliography that will support the study.
Environment Canada will review and provide comments to the Contractor within three (3) working days after receiving the documents.
Deliverable #4 – Interim Report: The Contractor must provide one electronic copy of the Interim report. The interim report must contain all the study findings and reflect work on tasks 1, 2 and 3 as per the Statement of Work.
The interim report must cover tasks 1, 2 and 3. The report must provide all the findings and the interpretation and the analysis of data including but not limited to identification of the gaps, correlation with existing data, assumptions and theirs supportive rationales and the limitations of the study. This interim report must also consider and address comments received during regular progress of the project and comments provided on Deliverables #1, #2 and #3.
Environment Canada will review and provide comments to the contractor within two (2) weeks after receiving the interim report.
Deliverable #5 – Draft Report: The Contractor must provide one electronic copy of the draft report. The draft report must contain all the study findings and reflect work on tasks 1, 2, 3 and 4 as per the Statement of Work. It must incorporate/address all comments provided by the Departmental Representative on Deliverable #4.
Environment Canada will review and provide comments to the contractor within two (2) weeks after receiving the draft report
Deliverable #6 – The Final Report is required in three versions;
o Full final report;
o Final report unabridged with protected confidential business information (CBI) clearly identified; and
o A summary of the final report that is CBI-free (i.e., where individual company information is not revealed or cannot be revealed through deduction).
The final report must address all comments provided by the Department Representatives on the Draft report. It must be provided in three versions (one full report, one report with CBI and third party confidentiality-requested information highlighted and properly sourced, and one summary report that is CBI free). The Contractor must provide the report in hard copy and electronically in Microsoft Word (Microsoft Office Suite 97-2007) and Adobe Acrobat (PDF). The final report must cover all aspects of the Terms of Reference. The Contractor should take into consideration all the comments provided on previous deliverables.
All versions of the Final Report must incorporate/address all comments provided by the
Departmental Representative on Deliverable #5.
Deliverable #7 – Oral presentation of the results: In person, the Contractor must give a 90 minute presentation including a question period to selected EC staff using Microsoft PowerPoint, and present the key findings of the report.
The Contractor must provide a deck and make oral presentation using Microsoft PowerPoint (Microsoft Office Suite 97-2007). This presentation should last at least an hour and half including a 30 minutes question period.
The background material, information or other material used to develop the main report must be documented in the report and be available to the Departmental Representative over the course of 5 years after completion of the report.
In addition to the final report, the Contractor must provide the Departmental Representative with:
All deliverables shall be provided no later than twenty-six (26) weeks after contract award.
Schedule
Task Dates
Initial Meeting Within 5 working days of Contract Award Date (CAD).
Final detailed methodology & work plan (deliverable #1) No later than 3 weeks after CAD
Draft Table of contents (deliverable #2) No later than 5 weeks after CAD
Final Table of contents (deliverable #3) No later than 6 weeks after CAD
Interim report (deliverable #4) No later than 14 weeks after CAD
Draft Report (deliverable #5) No later than 21 weeks after CAD
Final report (deliverable #6) No later than 24 weeks after CAD
Oral Presentation (deliverable #7) No later than 26 weeks after CAD
Deliverables 1 to 6 must be provided electronically in Microsoft Word (Microsoft Office Suite 97-2007).
VIII. ACCEPTANCE OF DELIVERABLES
All discussion papers, reports and correspondence produced by the contractor will be subject to review by persons designated by the Department Representative. All work is to be performed in accordance to recognized industry or academic standards and to the satisfaction of the Department Representative.
IX. TRAVEL
One trip to Gatineau (Quebec) is required in order to present the results of the study.
The request for travel must be made to the Department Representative prior to the trip, and must be pre-approved in writing.
The Contractor will be paid its authorized travel and living expenses, reasonably and properly incurred in the performance of the Work, at cost, without any allowance for profit, in accordance with the negotiated meal, private vehicle and incidental allowances specified in Appendices B, C and D of the Treasury Board (TB) Travel Directive http://www.tbs-sct.gc.ca/hr-rh/gtla-vgcl/index_e.asp and with the other provisions of the directive referring to “travellers,” rather than those referring to “employees.”
X. METHOD OF PAYMENT
Payments will be made according to the following schedule:
XI. PROJECT BUDGET
Environment Canada has established funding for this project at a maximum amount of $85,000.00 excluding (HST). Travel expenses will be reimbursed up to a maximum of $2,500.00 (excluding HST) and must be included in the total cost of the project.
Fiscal Year 2013/2014: From date of award to March 31, 2013:
Fiscal Year 2014/2015: From April 1, 2014 to March 31, 2015:
Get a plain-English breakdown of this tender — what they need, who can bid, how to approach it, and tips for small suppliers. Takes a couple of seconds.
10 past awards in this classification and 0 likely incumbents from this buyer. Pro shows who won and for how much.
Upgrade to Pro